Project: Lobo Switching Station Expansion

Location: Laredo, TX

Scope: Installation of 110 drilled piers totaling over 650 cubic yards in the station as well as 5 dead end foundations totaling over 500 cubic yards on the 4 mile transmission line. ASB also drilled, set and backfilled 20 direct embed structure bases along the transmission line.